Network Trace Tool

icon critical pathThe OPDEC Network Trace tool allows a user to easily identify all of the activities leading up to, back from, or in-between one or more points in the schedule. This is used by planners to ensure that tasks are linked via logic (predecessor / successor) links to another milestone or task in the schedule. Use the Redundant Links reporting feature to help remove confusing logic by identifying activities that exhibit multiple links to its immediate successor task(s).

Features include:

  • Identify activities preceding or proceeding from one or more points in the schedule
  • Identify activities between two points in the schedule
  • Redundant Links Reporting feature: Identifies activities that exhibit multiple links to its immediate successor task(s)
  • Profile capability makes supporting multiple programs easier

The image illustrates how the utility identifies all predecessors from a given point within the schedule. This is not an output example.

Requirements

  • Microsoft Project 2003 - 2016 32-bit
  • Microsoft Windows 7, 8, and 10

Downloads

All installs can be used as a 30-day trial

Contact This email address is being protected from spambots. You need JavaScript enabled to view it. for more information.

OPDEC INC.

700 Boulevard S
Suite #406
Huntsville, AL
35802

CONTACT

256.881.1038
support@opdec.com
sales@opdec.com

FOLLOW US