Critical Path Tool
Critical Path Tool"Critical Path" is defined as: "The longest duration of a set series of activities to a milestone (event)". The OPDEC Critical Path tool is an add-on to Microsoft Project that displays a graphic representation of up to 5 critical paths and their associated integration points. It provides a quick analysis of the critical paths to Major Milestones in the Integrated Master Schedule (IMS).
Critical Path Tool

The example displays the top 5 critical paths to the Milestone. The legend (Path 1, Path 2, etc.) shows the float (slack) for each path. The user is now equipped with the required reference points to enable quick analysis of the IMS mapping network.
 

Version 2009

Build: 2.3.6
Post Date: September 17, 2010

NEW USERS : Use the link below to download and install the software

INSTALL NOW »

  EXISTING USERS: Use the link below to update your software to the latest revision

UPDATE NOW »


Note: Software may be used up to 10 times before purchase is required

Documentation:

User's Guide
Latest Revsion Notes

Adobe® Acrobat Reader
Adobe® Acrobat Reader software is required to view Portable Document Format (PDF) files and can be downloaded for free from the Adobe Web site.

Requirements:

  • Milestones Professional 2006/2008
  • Microsoft Project 2000, 2003 and 2007
  • Microsoft Windows XP, Vista (w/Admin Rights)

  • Features and Benefits:

  • Integrates with Microsoft Project
  • Displays a graphic representation of up to 5 critical paths
  • Provides a quick analysis of the critical paths to Major Milestones in the Integrated Master Schedule (IMS).