Microsoft Project Tools

Network Trace

OPDEC’s Network Trace Tool allows users to easily identify all of the activities leading up to, back from, or in-between one or more points in the schedule

This image illustrates how the utility identifies all predecessors from a given point within the schedule. This is not an output example.

The OPDEC Network Trace tool allows a user to easily identify all of the activities leading up to, back from, or in-between one or more points in the schedule. This is used by planners to ensure that tasks are linked via logic (predecessor / successor) links to another milestone or task in the schedule. Use the Redundant Links reporting feature to help remove confusing logic by identifying activities that exhibit multiple links to its immediate successor task(s).

Network Trace features include:

  • Identify activities preceding or proceeding from one or more points in the schedule
  • Identify activities between two points in the schedule
  • Redundant Links Reporting feature: Identifies activities that exhibit multiple links to its immediate successor task(s)
  • Profile capability makes supporting multiple programs easier

Requirements

Downloads

  • Version 2020
    Download  |  User Guide
    Build 20.1.4 | May 3, 2023
  • Version 2016 
    Download  |  User Guide
    Build 2016.3.0 | October 15, 2018
  • All software can be used as a 30-day trial